Demonstrate risk strategy is satisfied outside ODM

It shall be demonstrated that the minimum risk strategy defined for outside the ODM ([MM]) will be satisfied by the AS during operation. This requires that evidence is generated which shows that the requirements of the strategy are implemented by the AS. This shall be achieved by performing verification activities, which could take a number of forms. The verification process for AS is discussed in detail in Stage 8. The results of verification activities shall be documented in the outside ODM verification report ([OO]).

Continue to: Activity 27. Instantiate out of context operation assurance case pattern